State of NevadaPrototype
  • NV.gov
  • water.nv.gov
  • Staff sign-in

Office of the State Engineer

Division of Water Resources

Sign in
  • Home
  • File
  • Fees
  • Status
  • Notices and protests
  • Hearings
You are here:
  1. NV.gov
  2. Water right filings
  3. About the data

About the data

Mixed

Public data fetched November 24, 2026; demo date Monday, January 11, 2027

How this fits the Division's own tracker

  • The Division is developing an application tracking system, to be used internally first and then opened to the public (the State Engineer, May 2026).
  • This prototype is the filing front end: guided forms, the fee from the statute, card payment, the completeness check, protests online and a public status page. Each online filing becomes one record in a documented layout the tracker can load (staff side: Feed to the Division’s tracker).
  • It does not connect to the tracker or to the Division’s permit database. Files already in the queue appear here as if loaded once from the Division’s records.

Sources

SourceFeedsRetrievedData
NRS Chapter 533, Adjudication of vested water rights; appropriation of public waters (533.325 to 533.435)The fee schedule (533.435), publication (533.360), protests (533.365), the two-year decision rule and its postponements (533.370(4)), permit terms (533.380), proofs (533.390, 533.400), cancellation (533.410), certificates (533.425), temporary changes (533.345) (seed/real/dwr-fee-schedule.json, dwr-process.json)2026-11-24Real public data
Division of Water Resources, Fees (and the printable statutory fee sheet)Cross-check of every fee the calculator and the server charge2026-11-24Real public data
Division of Water Resources, Water Rights FormsThe 44 PDF, Excel and e-form links by section; the forms each online filing replaces; what stays on the Division’s site (dwr-forms.json)2026-11-24Real public data
Permitting Process and Approximate Timeline (flowchart, Rev. 2/2024)The stages on every status page: completeness (about 30 days), return for correction (60 days), publication, protest period, ready for action, decision, permit fees (up to 90 days), permit, proofs, certificate (dwr-process.json)2026-11-24Real public data
Summary of Statutory Procedures and Fees (brochure); Water Rights FAQ (Rev. 2/2024)Surveyor’s map requirement, "ready for action", field investigations and hearings on protests, cultural maps and 12 months of meter readings for beneficial-use proofs2026-11-24Real public data
Application forms (new appropriation, change) and the Proof of Beneficial Use instructionsThe questions the online forms ask, the legal-description check, the notarized-affidavit requirement quoted in the drawers2026-11-24Real public data
Water Right Publications: New Applications for Water RightsThe 193 applications in publication on Nov 24, 2026, shown as posted on Notices (owner names and descriptions removed), and the mix of county, basin, source, manner of use, amount and change share that shapes the synthetic files (dwr-publications-2026-11-24.json)2026-11-24Real public data
Groundwater Basin Summaries (basin list)The 256 hydrographic basins and sub-basins in every basin picker and filter (dwr-basins.json)2026-11-24Real public data
The Fallon Post, "State Engineer Outlines Priorities and Challenges for Nevada Water" (May 1, 2026)About 1,000 applications a year, more than 2,000 pending, half protested, 30% within six months and 30% more within a year, 15 of 115 positions vacant, the Division’s own tracker in development (dwr-performance.json)2026-11-24Real public data
Nevada counties and communitiesCounty and community pickers (nv-places.json)2026-11-24Real public data

What is synthetic

  • Every person, applicant, surveyor, protestant and staff member, and every application, proof, review, protest, field investigation, payment, permit and ruling. Application numbers follow the Division’s numbering but do not refer to real files; the 193 real numbers on the posted list are skipped.
  • The 2,000+ pending applications and about 3,700 earlier decisions: their volume, protest share and timing are shaped to the State Engineer’s published figures; their counties, basins, sources, uses and amounts are drawn from the real publication list.
  • Which documents each filing type asks for is a simplification of the Division’s forms and brochure.
  • The proposed target of 80% decided within 12 months is a proposal, set against the State Engineer’s figure of about 60% today.
  • Card payments are simulated: any number that passes the Luhn check is accepted and settles the next business day. No fee is charged that NRS 533.435 does not set.
  • Online verification of protests and proofs by declaration in place of a notarized affidavit is shown as a proposal for the State Engineer to decide.

Fetch notes

  • water.nv.gov and tools.water.nv.gov pages were fetched at least 4 seconds apart; nothing was signed into. The e-forms site (forms.water.nv.gov) appears only as its sign-in page.
  • The flowchart PDF is an image; its stages and time frames were read from the rendered page.
  • The NDWR Strategic Plan FY2023–27 is cited from the public-site audit’s search summary and was not re-read here.

Water right filings

  • File an application or proof
  • Fee calculator
  • Where is my application
  • Notices and protests
  • Field investigations and hearings
  • My filings and permits
  • About the data

Still on the Division’s site

  • E-forms: extensions of time, proofs of appropriation
  • Domestic well and other forms
  • Water right search and hydrographic abstracts

Division of Water Resources

  • water.nv.gov
  • 901 S. Stewart St., Suite 2002, Carson City · (775) 684-2800
  • NRS Chapter 533
State of Nevada · Prototype · Division of Water Resources · Water Right FilingsA Concourse prototype. Filings, people and payments shown are not real.